Low Graphics Version     
VisitingLivingWorkingDepartmentsCalendarsServices
Homepage > ... > Building & Safety > When Is Plan Check Required? > Mechanical Plan Check RequiredE-mail storyPrint friendly format
Online Services

Mechanical Plan Check Required

MECHANICAL PLAN CHECK REQUIRED


Before a permit may be issued, the following plans shall be filed and approved by the Building & Safety Department:

1. Installations where the aggregate BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over for comfort heating or for comfort-cooling or for absorption units for COMMERCIAL APPLICATIONS.

2. Installations where the system BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over for comfort heating or for comfort cooling or for absorption units for RESIDENTIAL APPLICATIONS.

3. Smoke-control systems.

4. Any comfort-cooling compressor or refrigeration compressor for any system which contains any Group B refrigerant.

5. Any commercial cooking hood and ventilation system.

6. Engineered water heater/heating appliance vents.

Mechanical Permit Application

Plumbing, Mechanical and Electrical (PME) Plan Check Questionnaire

Top
Copyright © 2000 - 2014 City of El Segundo, 350 Main Street, El Segundo, CA 90245 ยท 310-524-2300 | Website Privacy Policy. Powered by