·Replaced approximately 50,000 square feet of asphalt pavement in preparation for the Slurry Seal project
as well as general repairs throughout the City.
·Repaired the southwest quadrant of the residential community for slurry seal.
·Replaced defective sidewalk and curbing as needed, under contract. Maintained an
ongoing list for future repair.
·Removed weeds from Sepulveda Boulevard, Downtown streets and sidewalks on an ongoing basis.
·Removed graffiti in accordance with the City’s Graffiti Removal Program for facilities in the
public right-of-way and on City buildings, except Parks Department facilities,
within 24 hours of notification. The Parks Department has its own program).
·Maintained a list of locations throughout the City for the Curb and Sidewalk Replacement Program.
All complaints were responded to by an inspection within 24 hours and will be included in the
annual replacement program. Where necessary, hazards were ground down within five days.
· Responded to by an inspection within 24 hours and will be included in the annual replacement program.
Where necessary, hazards were ground down within five days.
·Inspected and performed day to day administration of newsracks. Coordinated the installation of
uniform newsracks in the Downtown Commercial Zone.
·Performed Public Work Permit inspections.
·Administer slurry seal contract.
·Perform Public Work Inspections.
·Conduct quarterly streetlight outage survey and report to Southern California Edison.