El Segundo
Home MenuNews
Construction Notice: Lane Closures
Post Date:02/03/2026 8:57 AM
Starting this Thursday, Feb. 5, Vero Fiber Networks and their Contractor, HP Communications, will be performing cable pulling in previously-installed conduits.
As shown in the map below, lane closures will begin on Imperial Highway and Main Street and progress sequentially through Mariposa Avenue, Indiana Street, E Grand Avenue, and Duley Road. This work will occur over approximately five weeks, Monday through Friday, 9 a.m. to 3 p.m.
The contact for Construction/Traffic Control is Herb Wood, Project Manager for HP Communications. Herb can be contacted at Herbert.Wood@hpcomminc.com or 951-433-0380.
- TC13: Left Lane Closure traveling south bound on Main St., between Imperial Ave and Walnut Ave
- TC12: Left Lane Closure traveling north bound on Main St. between E Mariposa Ave and Walnut Ave.
- TC 11: Narrow Lane traveling east bound on E Mariposa Ave. between Main St. and Standard St.
- TC10: Narrow Lane traveling west bound on E Mariposa Ave. between Sheldon St. and Eucalyptus
- TC9: Narrow Lane traveling west bound on E Mariposa Ave between Maryland St. and Sierra St.
- TC8: Lane Closure traveling west bound on E Mariposa Ave. between California St. and Center St.
- TC7: Narrow Lane traveling west bound on E Mariposa Ave. between PCH and Washington St.
- TC 6: Lane Closure traveling south bound on Indiana St. between Mariposa and Pine Ave
- TC 5: Lane Closure traveling south bound on Indiana St. between Pine Ave and Holly Ave
- TC4: Lane Closure traveling west bound on E Grand Ave between Continental Blvd. and Indiana St.
- TC3: Left Lane Closure traveling east bound on E Grand Ave. between PCH and Continental Blvd.
- TC2: Left Lane Closure traveling east bound on E Grand Ave. between Continental Blvd. and Nash St.
- TC 1: Lane Closure traveling east bound on E Grand Ave. between Nash St. and Duley Rd.
